House build on Lismore

This year we have been busy providing groundwork services for a contemporary house build on the island of Lismore.

Like most of our island jobs, the logistics can prove a challenge what with moving building materials, concrete lorries and plant around on limited ferries but past experiences have helped this job go as smoothly as possible.

Bellmouth upgrade as required by planning.

Road widened

Working alongside archaeologist
Archaeological survey for house site
New road strip for access to house
Road formation
Road reaching house site
House site strip
Flyover house site.
Pad foundations dug and poured with galvanised steel columns in place.
Underground services being installed.
Steel sub-frame install.
Kingspan tray system.
Concrete floor poured.
SIPs kit arriving.
SIPs kit going up.

Rainwater pipe work going in.

Rainwater harvesting tank.
Structurally unsafe building removed.

Related Posts